The installation and debugging of the shot blasting equipment includes the installation of the shot blasting chamber, the installation of the shot blasting device, the installation and debugging of the input and output cooling bed, the installation of the promotion bucket and the installation and debugging of the sand separator. The main points of each component are explained below:
1 Shot blasting room: The installation of the shell of the shot blasting room needs to be positioned strictly according to the drawings. The *** line of the conveyor roller table and the *** line of the shell must be in accordance with the drawings to ensure consistency. The installation allows a certain error, but it must be controlled within a certain range, otherwise it will affect the operation of the equipment and the life of related parts.
2 Shot blasting device: The shot blasting device as a whole has been assembled and tested before leaving the factory. Now it needs to do another inspection to check the fixing position of each component and the fixing situation of fasteners.
3 Input and output cooling bed: The shape and structure of the input and output cooling bed are basically the same, the difference is the thrust direction of the thrust rod, and you must pay attention to the position of the input and output during installation. In addition to keeping the height of the roller bed of the cold bed the same, the connection position of the roller table and other components must be kept unobstructed.
4 Promotion bucket: The promotion bucket is located at the end of the shot blasting room. During installation, it is necessary to ensure that the belt has a certain degree of tension.
5 Shot sand separator: The shot sand separator mainly checks whether the ram is flexible, and after adding steel shots, check whether the steel shots are running smoothly and evenly.